DLI projects

This page has information relating to the logistics and infrastructure projects in the Northern Territory. If you are searching for projects relating to the planning projects, please go to Department of Lands, Planning and Environment.

Alice Springs

Alice Springs CBD revitalisation

The Alice Springs CBD is being invigorated to create a safer and more vibrant CBD for locals and visitors to enjoy.

Type: Buildings and infrastructure

Status: Completed

Alice Springs

Anzac Oval Precinct Master Plan

The precinct will feature a multi-purpose space designed for community use, including sport and recreation and multicultural activities, as well as a First Nations art gallery designed in a culturally appropriate way.

Type: Buildings and infrastructure

Status: Underway

Darwin

Arnhem Highway duplication planning study

The Northern Territory Government is undertaking a planning study for the future duplication of a 10 kilometre section of the Arnhem Highway from the Stuart Highway intersection to Kostka Road in Humpty Doo.

Type: Roads and transport

Status: Planning and consultation

Darwin

Bagot Road - improving cycling

A planning study to improve cycling conditions including development of concept design options.

Type: Roads and transport; Lands and planning

Status: Planning and consultation

Darwin

Bagot Road pedestrian overpass handrail upgrade

The Department of Logistics and Infrastructure is upgrading the handrails on Bagot Road pedestrian overpass, adjacent to Ludmilla Primary School.

Type: Roads and transport

Status: Underway

Darwin

Batchelor Airport Master Plan

The master plan for Batchelor Airport will transform the existing airstrip into an aviation hub, supporting a range of commercial general aviation activities over the long term.

Type: Roads and transport

Status: Planning and consultation

Darwin

Bayview drain erosion protection

Repairs and upgrades various locations in the Bayview stormwater drain in 2024.

Type: Buildings and infrastructure

Status: Completed

Darwin

Berrimah gravity sewer construction

The Department of Infrastructure, Planning and Logistics is constructing a new sewer main in Berrimah to support growth and future development in the area.

Type: Buildings and infrastructure

Status: Underway

Darwin

Berrimah Road duplication

Read about the future duplication of Berrimah Road, between the Stuart Highway and Tiger Brennan Drive.

Type: Roads and transport

Status: Planning and consultation

Katherine

Buntine Highway investment strategy

A $125 million project, jointly funded over ten years from 2019

Type: Roads and transport

Status: Planning and consultation

Territory-wide

Carpentaria Highway major upgrade

A $150 million project, jointly funded over four years delivering major upgrades to sections of the Carpentaria Highway.

Type: Roads and transport

Status: Planning and consultation

East Arnhem

Central Arnhem Road upgrades

$355 million has been committed to deliver initial priority upgrades along Central Arnhem Road.

Type: Roads and transport

Status: Planning and consultation

Palmerston

Chung Wah and Emery Avenue roundabout

Construction of a new roundabout at the intersection of Chung Wah Terrace and Emery Avenue, Palmerston in 2024.

Type: Roads and transport

Status: Completed

Darwin

Coolalinga road safety upgrades

Read about the staged road upgrades at Coolalinga.

Type: Roads and transport

Status: Planning and consultation

Katherine

Cotton Gin intersection – Stuart Highway, Katherine

The Department of Infrastructure, Planning and Logistics (DIPL) is undertaking works on the Stuart Highway, to support the new Cotton Gin facility.

Type: Roads and transport

Status: Completed

Darwin

Cox Peninsula Road and Southport Road intersection upgrade

The upgrade will involve widening Cox Peninsula Road to accommodate dedicated left and right turning lanes onto Southport Road.

Type: Roads and transport

Status: Completed

Darwin

Darwin bus stop upgrades 14 and 129

The Department of Infrastructure, Planning and Logistics is upgrading six bus stops across the Darwin network to improve passenger experience and safety.

Type: Roads and transport

Status: Completed

Darwin

Darwin Passenger Rail Terminal

The Northern Territory Government is investigating alternate locations for the Darwin Passenger Rail Terminal, with a tender released to undertake a feasibility study.

Type: Buildings and infrastructure

Status: Planning and consultation

Darwin

Darwin Urban Asphalt Projects 2024

The asphalt repair works will take place at night to reduce disruption to traffic and businesses.

Type: Roads and transport

Status: Underway

Darwin

Demolition of former Casuarina Fire Station

Information about the demolition of former Casuarina Fire Station in October 2024.

Type: Buildings and infrastructure

Status: Underway

Darwin

Dundee Beach boat ramp

Works to improve functionality of the Dundee Beach boat ramp.

Type: Buildings and infrastructure

Status: Underway

Darwin

Elcho Island Airstrip

Read about a new, secure aircraft compound to be constructed at the Elcho Island Airport in Arnhem Land.

Type: Buildings and infrastructure

Status: Planning and consultation

Darwin

Emergency Vehicle Priority (EVP) system

The Department of Infrastructure, Planning and Logistics is trialling an emergency vehicle priority (EVP) system to improve ambulance emergency response times.

Type: Roads and transport

Status: Completed

Darwin

Fishing jetty – Dudley Point

The Northern Territory Government is committed to providing fishing opportunities for everyone across the Territory through a variety of recreational fishing infrastructure and services.

Type: Buildings and infrastructure

Status: Planning and consultation

Darwin

Former Don Dale Youth Detention Centre site demolition

The Department of Infrastructure, Planning and Logistics is demolishing the former Don Dale Youth Detention Centre site on Tivendale Road, Berrimah.

Type: Buildings and infrastructure

Status: Underway

Darwin

Gunn Point and Glyde Point Road planning study

Read about the planning study to inform the concept development for Gunn Point Road and confirm the most appropriate alignment for Glyde Point connection.

Type: Roads and transport

Status: Planning and consultation

Alice Springs

Heavitree Gap planning study

Read about the study to investigate a long-term infrastructure solution for duplicating the road through the Heavitree Gap.

Type: Roads and transport

Status: Planning and consultation

Darwin

Hospital precinct intersection upgrade

The Northern Territory Government is upgrading the hospital precinct intersection at Rocklands Drive and Florey Avenue.

Type: Roads and transport

Status: Planning and consultation

Alice Springs

Jim McConville Oval - Ground Upgrades

The project aims to temporarily transition Jim McConville Oval from a cricket and AFL oval to a rugby oval.

Type: Buildings and infrastructure

Status: Underway

Alice Springs

Jim McConville Oval lighting towers

The Northern Territory Government, together with the Alice Springs Town Council is building 4 permanent lighting towers at Jim McConville Oval in Gillen, Alice Springs.

Type: Buildings and infrastructure

Status: Planning and consultation

Darwin

Kahlin Compound Memorial – design

The NT Government is creating a commemorative space at the historic Kahlin Compound site, honoring Aboriginal history through stakeholder collaboration.

Type: Buildings and infrastructure

Status: Planning and consultation

Katherine

Katherine High School STEAM Centre

The Department of Infrastructure Planning and Logistics (DIPL) is conducting works at Katherine High School to build a new STEAM Centre.

Type: Buildings and infrastructure

Status: Underway

Darwin

Leanyer Primary School - new classroom building

Construction of a new classroom building at Leanyer Primary School.

Type: Buildings and infrastructure

Status: Underway

Darwin

Litchfield National Park car park resealing

The Department of Logistics and Infrastructure (DLI) is undertaking works in Litchfield National Park to reseal 3 car parking areas.

Type: Roads and transport

Status: Underway

Katherine

Lot 495, Town of Katherine – demolition

The Department of Infrastructure, Planning and Logistics (DIPL) is demolishing the old buildings and clearing the site on Lot 495, Town of Katherine.

Type: Buildings and infrastructure

Status: Completed

Darwin

Marrakai Road – upgrade and seal Arnhem Highway to Stephen Road

The Department of Infrastructure, Planning and Logistics (DIPL) is upgrading the Arnhem Highway and Marrakai Road intersection, and Marrakai Road, from the Arnhem Highway to Stephen Road.

Type: Roads and transport

Status: Underway

Alice Springs

Maryvale Road

Read about the upgrading and sealing of approx. 10kms of Maryvale Road.

Type: Roads and transport

Status: Planning and consultation

Darwin

McMillans Road, Northlakes pedestrian crossing

This study looked at ways to improve pedestrian safety on McMillans Road near Northlakes Shopping Centre.

Type: Roads and transport; Lands and planning

Status: Completed

Darwin

Middle Arm Sustainable Development Precinct

The precinct will be a master planned area with a focus on low emission hydrocarbons, green hydrogen, advanced manufacturing, carbon capture and storage and minerals processing.

Type: Buildings and infrastructure; Lands and planning

Status: Planning and consultation

Darwin

Nightcliff Middle School Carpark and Kiss & Go

Delivering a new carpark and kiss and go area for Nightcliff Middle School with work staring in October 2024.

Type: Buildings and infrastructure

Status: Underway

East Arnhem

Oenpelli Road – repairs and maintenance

Repairs and maintenance on Oenpelli Road in East Arnhem in 2024.

Type: Roads and transport

Status: Completed

Palmerston

Palmerston bus stop upgrades

The Department of Infrastructure, Planning and Logistics is upgrading four bus stops across the Palmerston network to improve passenger experience and safety.

Type: Roads and transport

Status: Underway

Darwin

Parap Preschool Redevelopment

NT Government is redeveloping the Parap Preschool, providing improved functionality for students, teachers and families.

Type: Buildings and infrastructure

Status: Underway

Darwin

Paru Road upgrades - Melville Island

The Department of Infrastructure, Planning and Logistics is upgrading and sealing approximately 9kms of Paru Road on Melville Island.

Type: Roads and transport

Status: Completed

Darwin

Pedestrian Crossing Upgrades - Stuart Highway

The Department of Infrastructure Planning and Logistics (DIPL) is undertaking works to upgrade existing pedestrian crossings at two locations, Stuart Highway/McMillans Road intersection and Stuart Highway/Vanderlin Drive intersection.

Type: Roads and transport

Status: Underway

Darwin

Pinelands road safety upgrades

Information about the Pinelands and Holtze upgrade consultations.

Type: Roads and transport

Status: Planning and consultation

Darwin

Planning infrastructure for future integrated ferry services study

Read about the study to analyse a number of potential sites for future ferry terminals.

Type: Roads and transport

Status: Planning and consultation

Darwin

Richardson Park community space

Read about the project to enhance and activate the Richardson Park area for the community (residents) and Ludmilla Primary School.

Type: Buildings and infrastructure

Status: Underway

Territory-wide

Road safety program

The National Road Safety Program funds effective road safety treatments on urban, rural and regional roads to provide greater benefits for all road users.

Type: Buildings and infrastructure; Roads and transport

Status: Underway

Darwin

Royal Darwin Hospital 32 bed ward

The Northern Territory Government is building a new 32 bed modular ward at the Northern Territory’s main hospital campus, Royal Darwin Hospital (RDH).

Type: Buildings and infrastructure

Status: Underway

Darwin

Rum Jungle intersections

The Department of Logistics and Infrastructure (DLI) is upgrading two intersections at Litchfield Park Road and Poett Road.

Type: Roads and transport

Status: Underway

Alice Springs

Safety upgrades at Larapinta Drive, Blain Street and Diarama Close

This planning study aims to get feedback on safety upgrades at Larapinta Drive, Blain Street and Diarama Close.

Type: Roads and transport

Status: Planning and consultation

Alice Springs

Safety Upgrades at Roger Vale Drive and the Stuart Highway, Alice Springs

The Northern Territory Government is undertaking a planning study for safety upgrades around the Roger Vale Drive and Stuart Highway intersection, south of Alice Springs.

Type: Roads and transport

Status: Planning and consultation

Darwin

Shiers Street Housing Redevelopment

This project is to redevelop the public housing complex to transform this site into a modern, fit for purpose precinct with a mix of social and affordable housing.

Type: Buildings and infrastructure

Status: Underway

Territory-wide

Social Housing Accelerator Payment

The Australian Government has committed $50 million to deliver up to 100 new social and accessible homes across the Territory.

Type: Buildings and infrastructure

Status: Underway

Katherine

Stuart Highway duplication at Katherine East

The project aims to duplicate the Stuart Highway at Katherine East.

Type: Roads and transport

Status: Underway

Darwin

Stuart Highway Road Safety Improvements– Stuart Park

The project aims to improve road safety on the Stuart Highway, from Armidale Street to the Westralia Street intersections in Stuart Park.

Type: Roads and transport

Status: Planning and consultation

Alice Springs

Tanami Road upgrades

The Northern Territory Government is upgrading and sealing 150kms of the Tanami Road in Central Australia, a jointly funded project between the Australian and Northern Territory Governments.

Type: Roads and transport

Status: Underway

Tennant Creek

Tennant Creek entry statements

The Northern Territory Government is delivering iconic tourism entry statements in Tennant Creek. The entry statements will be located on the southern and northern Stuart Highway approach to the town.

Type: Buildings and infrastructure

Status: Underway

Tennant Creek

Tennant Creek Streetscaping

The Northern Territory Government is delivering iconic tourism entry statements in Tennant Creek. The entry statements will be located on the southern and northern Stuart Highway approach to the town.

Type: Buildings and infrastructure

Status: Underway

Territory-wide

Tennant Creek to Darwin infrastructure corridor

The proposed corridor provides for future services such as multiple high pressure pipelines and infrastructure to carry a range of products including gas, oil, hydrogen energy, water, digital communications and electricity.

Type: Buildings and infrastructure; Lands and planning

Status: Planning and consultation

Territory-wide

Territory-wide audit of septic tank type sewerage systems at all NT Government-owned and managed locations

The Northern Territory Government is committed to providing safe public housing and infrastructure throughout the Territory. Conducting on-site audits of septic tank type sewerage systems is an important step in ensuring their safety and functionality.

Type: Buildings and infrastructure

Status: Underway

Darwin

Tiger Brennan Drive and Berrimah Road intersection overpass

The project aims to enhance safety and improve connectivity by separating the major flow of traffic at the intersection.

Type: Buildings and infrastructure

Status: Underway

Darwin

Tiger Brennan Drive and Wishart Road intersection upgrades

The Northern Territory Government is upgrading the intersections of Tiger Brennan Drive/Wishart Road and Wishart Road/Kirkland Road.

Type: Roads and transport

Status: Completed

Territory-wide

Traffic signal - ITS devices and streetlighting maintenance for a period of 60 months

The Department of Logistics and Infrastructure (DLI) is currently exploring opportunities for procuring traffic signal, Intelligent Transport Systems (ITS) and Streetlighting maintenance services in the Northern Territory, Australia.

Type: Buildings and infrastructure

Status: Planning and consultation

Darwin

Trower Road pedestrian overpass handrail replacement

The Department of Infrastructure, Planning and Logistics is conducting maintenance works to the Trower Road pedestrian overpass near the Jingili Water Gardens.

Type: Roads and transport

Status: Completed

Darwin

Upgraded and new pedestrian crossings

The project will upgrade and construct pedestrian crossings at Trower Road and Parer Drive intersection, and the the Rapid Creek side of McMillans Road and Rothdale Road intersection.

Type: Roads and transport

Status: Underway

Darwin

Vanderlin Dr and Lee Point Rd intersection

A planning study to look at future options to upgrade Vanderlin Drive and Lee Point Road intersection.

Type: Roads and transport; Lands and planning

Status: Planning and consultation

Darwin

Vanderlin Drive duplication planning study

The Northern Territory Government is undertaking a planning study to investigate the future duplication of Vanderlin Drive between the Stuart Highway and McMilllans Road.

Type: Roads and transport

Status: Planning and consultation

Territory-wide

Variable message signs on Territory roads

The Northern Territory Government is installing thirty (30) Variable Message Signs (VMS) across the Territory to provide timely and accurate information to travellers.

Type: Roads and transport

Status: Completed

Katherine

Victoria Highway roadworks

The Northern Territory Government is upgrading the Victoria Highway on a 60km stretch, starting 40km west of Katherine, to improve safety for road users.

Type: Roads and transport

Status: Underway

Darwin

VMBs at boat ramps

The Department of Infrastructure, Planning and Logistics (DIPL) is installing variable message boards (VMBs) at various Darwin boat ramps to help keep Territorians safe.

Type: Buildings and infrastructure

Status: Completed

Darwin

Weddell Freeway Planning Study

A planning study into the potential development of the Weddell Freeway.

Type: Roads and transport; Lands and planning

Status: Planning and consultation

Palmerston

Zuccoli Primary School

Information about a new government school in Palmerston.

Type: Buildings and infrastructure

Status: Underway


Give feedback about this page.

Share this page:

URL copied!